FETTERS HOT SPRINGS–AGUA CALIENTE — CALIFORNIA58 LOCAL. Larson Park’s existing pathway system links local recreation space with Flowery Elementary School and neighborhoods in Fetters Hot Springs through two bridges over Pequeño Creek.
Details for residents and visitors
Sonoma County’s park master plan describes a multi-use segment of the Central Sonoma Valley Trail entering the park over one bridge and a separate connection from the school’s western playing fields over another.
The document also notes that Sonoma Creek borders the park to the west and that paths and drainage improvements need to protect mature vegetation and creekside habitat. Plans considered improving pedestrian circulation so visitors would not have to walk in the vehicle driveway.
The bridges and trail network are existing features described in the park’s planning record; proposed path enhancements are separate projects and should not be treated as complete without current documentation.
People walking or biking to the park should observe any posted closure, especially after storms or during construction.
Source: Published public agency record. Check current availability and recent notices with the responsible agency.
Support Fetters Hot Springs-Agua Caliente News
Choose how to support Fetters Hot Springs-Agua Caliente News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Fetters Hot Springs-Agua Caliente News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Fetters Hot Springs-Agua Caliente News
- Agua Caliente Creek Sewer Crossing Was Rebuilt in 2016 to Protect Local Waterways →
- Free Sonoma Shuttle Route 32 Serves Agua Caliente and Connects to Sonoma Plaza →
- Larson Park Plan Proposes New Playgrounds, Pickleball and Tennis Courts in Fetters Hot Springs →
- Fetters Hot Springs–Agua Caliente Sewer Upgrade: What Phase 5B Means for Sonoma Valley →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.